The MCES Fridley facility improvements focused on transforming an underutilized building into a functional regional maintenance hub for Metropolitan Council Environmental Services (MCES).
MCES acquired the Fridley Liquid Waste Receiving (LWR) facility in 2009 from a private owner who had intended to operate it as a wastewater receiving station, including a fats, oils and grease (FOG) recovery operation. However, the FOG recovery portion was never completed or put into use.
MCES planned to repurpose the existing facility to accommodate meeting spaces, workstations, staff amenities and vehicle and equipment storage. CR-BPS provided technical planning and conceptual design solutions to help address operational needs while making better use of the existing building.
Services Provided
Who We Serve
The Prime Consultant Team felt CR-BPS team met or exceeded theirs and the client expectations related to value delivered, creativity of solutions and design, timeliness and project delivery.”
Amy Prok - SEH Project Engineer
Gallery
Challenges
The CR-BPS teams solutions were creative and cost effective. The client (MCES) loved Tari and Garrett’s suggested ideas and solutions."
Amy Prok - SEH Project Engineer
Approach
CR-BPS prepared a technical memorandum documenting existing building conditions, space requirements, process criteria and other project considerations.
This assessment provided the foundation for developing conceptual layouts that addressed operational inefficiencies and explored opportunities to repurpose underutilized areas of the building.
CR-BPS developed six conceptual layout alternatives, each accompanied by an estimate of probable construction cost. All six options met the Owner’s Project Requirements, giving MCES several solutions to evaluate based on functionality and cost effectiveness.
Primary CR-BPS team members were Tari Rayala, Garrett Klemish, Jim Larson. All CR-BPS displayed the same level of follow through, timeliness, and professionalism. Amy and Fasil enjoyed working with the CR-BPS team and are looking forward to bringing the team to the next phase of the project.”
Amy Prok - SEH Project Engineer
Results
The recommended CR-BPS conceptual design was accepted by the MCES user group as the option that best addressed operational needs while providing the most cost-effective solution.
The selected layout introduced an interior second story above the original office area, creating additional usable space without expanding the building footprint. Stair and two-stop elevator access connected the new upper level to the existing facility.
The proposed second floor included:
Open office workstations.
A flexible conference and training area that could accommodate classroom-style training or grouped seating arrangements.
A single-user restroom for staff convenience.
Through existing-condition assessments and the development of multiple design alternatives, CR-BPS helped MCES identify a practical approach to repurposing its facility and supporting the operational needs of its regional maintenance team.
As team leader Tari did a great job in checking in on details and timing.”
Amy Prok - SEH Project Engineer